To enable this display, your administrator can update “Show Booked Production in the Scheduler” to “Yes” at Setup > Account Info > [Advanced].
Refresh the Scheduler.
The values that appears in the scheduler will reflect the totals in the current view.
• The value inside the brackets is for managed care
• A column has been added to the details labeled “Prod Value for MC” = Production Value for Managed Care (this value is a total of the statuses other than “Cancelled”)
• The “Cancelled” column total does not include the Scheduled production number.